Hunter Bay Apartments

Adaptive Reuse

Hunter Bay Apartments

York, SC  2009

Part of the old Lockmore Mill burned prior to start up of an adaptive reuse project. Plans were changed and the remaining part of the building was saved and rehabbed into 13 units and the part that burned to the ground was replaced with new construction designed to blend in with the existing building and remind you of the old building. Historic credits were switched out for Mill credits and the new construction was built in the same footprint as the original mill.

Video of Lockmore Mill Fire

Related Projects